How We Waterproofed 278 Units Using Tremco's Deck Coating System

Arrowhead Condominiums · Davie, FL · $7,000,000 · 9 Buildings + Clubhouse · 40-Year Recertification

Arrowhead Condominiums restoration
$7M
Contract Value
278
Units
9
Buildings
40-yr
Recertification

The Challenge

Arrowhead Condominiums in Davie, FL presented one of the more complex scopes we've taken on — 278 units across 9 residential buildings plus a clubhouse, all requiring full concrete restoration and 40-year building recertification under Florida's Broward County structural inspection requirements.

The deck and balcony waterproofing scope alone covered thousands of square feet of exposed pedestrian-traffic surfaces. The system needed to perform in South Florida's UV-intense, high-humidity environment while being applied to substrates that included repaired concrete, existing coatings, and newly poured sections — often on the same building.

Why Tremco

We evaluated three deck coating systems before specifying Tremco for this project. The deciding factors: Tremco's pedestrian deck system is explicitly rated for occupied-building applications, it carries a long-term warranty that satisfies Florida's 40-year recertification documentation requirements, and their local technical support team has a strong track record in coastal South Florida conditions.

For a project with an engineer of record — Mark Le Blanc, PE of Specialty Engineering Consultants — the specification had to be defensible and supported by third-party performance data. Tremco's product documentation met every requirement the engineer had outlined in the scope spec.

The Application

Surface preparation was critical. All existing delaminated coatings were mechanically removed, spalled concrete was repaired using a compatible mortar system, and all transitions and penetrations were detailed with Tremco's joint treatment products before the base coat was applied.

The system was applied in multiple coats, with intermediate inspections at each stage. The broadcast aggregate topcoat was selected for pedestrian traction performance that met ADA requirements across all walkway areas.

Given the occupied nature of the complex, we worked building-by-building in a phased sequence that allowed residents to maintain access to common areas throughout the project duration.

The Result

The project was completed in August 2025 and passed 40-year recertification inspection. All waterproofing areas were tested for water infiltration post-application. Zero callbacks on waterproofing-related issues in the post-completion period.

"The quality of the work was outstanding. The restoration was completed to perfection — once painted, the transformation was remarkable. The crew was professional, courteous, and highly skilled."

— Anna Marie Zaccheo, Past Vice President & Director, Arrowhead Condominium, Inc.

Project Photos

Arrowhead restoration Arrowhead restoration Arrowhead restoration Arrowhead restoration Arrowhead restoration Arrowhead restoration Arrowhead restoration Arrowhead restoration
Product Used
TREMCO
Pedestrian Deck Waterproofing System
check_circle Traffic-rated pedestrian deck coating
check_circle UV-stable for South Florida exposure
check_circle Long-term warranty documentation
check_circle Occupied-building rated application
See All Tremco Use Cases arrow_forward
Project Details
Client
Arrowhead Condominium, Inc.
Location
Davie, FL
Value
$7,000,000
Completed
August 2025
Engineer
Mark Le Blanc, PE
Specialty Engineering Consultants, Inc.
License
CGC059211
Have a Similar Project?

We'll spec the right waterproofing system for your building and tell you exactly what it will cost.

Request a Free Assessment
(954) 553-5535 · Keith@lagalacon.com